The Arago Technology team announce they are in the process of manufacturing a full scale L3 Composite Cross Arm which will be installed, later this year, on to a L3 tower at the National Grid Training Centre at Eakring.
The aim of this work is to develop the technology further by addressing some of the installation and maintenance considerations that will be introduced by the technology as well as optimising the design further.

